enerji@age.com.tr

Subscribe

Our Dam and Energy Projects

Fethiye HEPP

Installed Capacity 16,5 MW

Karacaören Dam ve HEPP

Karakurt Dam

Installed Capacity 100 MW

Kavşak Bendi Dam ve HEPP

Installed Capacity 191 MW

Madra Dam ve HEPP

Pınar HEPP

Installed Capacity 30,10 MW

Sarmaşık I- II HEPP

Installed Capacity 41,96 MW

Shuakhevi HEPP – Georgia

Installed Capacity 185 MW

Yamaç HEPP

Installed Capacity 5,61 MW

Solar Power Projects

Erzurum Land SP

1000 kWP

Kütahya Land SP

2200 kWp

Balıkesir Land SP

3100 kWp

Karaman Land SP

800 kWp

Batman Boran Roof SP

185 kWp

Batman Boran Roof SP-2

61 kWp